FT

Maintenance

Field work orders, inspection schedules, and maintenance tasks.

2
High Priority Open
5
Total Open
1
In Progress
12
Completed (30 days)
WO-001 HIGH PRIORITY Open

Queen inspection — HV-045

Check queen status. Hive 45 showing reduced activity for 5 days. Field inspection required to assess queen viability and colony health.

Due: Today
Assigned: Field Tech 01
Site: Plateau Site 01 · Zone B
WO-002 MEDIUM Open

Deploy sensor nodes — Zone C (SN-151 to SN-153)

Install 3 new sensor nodes in Zone C to replace failed units. Nodes have been pre-provisioned. Use standard mounting procedure.

Due: Mar 30
Assigned: Field Tech 02
Site: Plateau Site 01 · Zone C
WO-003 MEDIUM Open

Harvest Batch 0422 — Zone A & B (scheduled)

Scheduled honey harvest for hives HV-001 through HV-100 (Zones A and B). Target ~120kg. Bring harvest containers and moisture meter.

Due: Apr 3
Assigned: Field Tech 01
Site: Plateau Site 01
WO-004 LOW Open

Gateway firmware update — GW-001, GW-003

OTA firmware update available for GW-001 and GW-003. Requires brief gateway restart (1–2 min downtime each).

Due: Apr 5
Assigned: Field Tech 02
WO-005 LOW Open

Zone C full hive inspection

Monthly inspection of all 50 hives in Zone C. Check frames, brood, stores, and sensor mounting.

Due: Apr 10
Assigned: Unassigned
WO-006 MEDIUM In Progress

Zone A monthly hive inspection

In progress — 28/50 hives inspected. Field Tech 01 is on-site.

Started: Today 09:30
Assigned: Field Tech 01
Progress28 / 50 hives
WOTaskHive / ZoneCompletedTechNotes
WO-011Hive inspection Zone BZone BMar 24Field Tech 01All 50 hives OK. 2 queens replaced.
WO-010Harvest HB-0421Zones A, B, CMar 26Field Tech 0185kg honey harvested. Moisture 17.5%.
WO-009Sensor replacement SN-034HV-034Mar 22Field Tech 02Replaced faulty sensor. Now reporting.
WO-008Gateway signal check GW-002GW-002Mar 20Field Tech 02Antenna re-aimed. Signal improved to -84dBm.